Home › Hardcover Books › Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

by Todd R. Zabelle Publisher: FORBESBOOKS

Rethinking how construction projects get built

Regular price $24.93 USD
Regular price $41.55 USD Sale price $24.93 USD
Save 40%

Hardcover New

In stock · Dispatches in 1–2 business days
Delivery to your door
In stock·Dispatches in 1–2 business days
Standard shipping* from $4.35
Standard shipping transit* 5–8 business days after dispatch

Faster options are available.

Rates and delivery estimates depend on your destination and item quantity. Estimates are informational only; the final shipping method and rate are selected at checkout.

Secure checkout
American Express Apple Pay DiscoverGoogle Pay Mastercard PayPalVisa
30-day eligible returns Returns & refunds policy

AlbakiReads Editorial

Rethinking how construction projects get built

Todd R. Zabelle examines why major construction projects so often run late and over budget, locating a central problem in the divide between planning and execution. The book frames projects as interconnected production systems and draws on operations science to reconsider how design, materials, labor, and delivery fit together. It also argues for treating design as continuous throughout a project and describes a shift toward work spread across locations, firms, suppliers, and jurisdictions. Digital tools—including AI, machine learning, and the Internet of Things—enter the discussion as technologies the industry could combine with operations and data science. The result is a business-focused case for changing how construction work is organized and managed.

Good fit for readers who enjoy

  • Construction professionals interested in project delivery and operational change
  • Owners, investors, and managers involved in capital projects
  • Readers exploring the application of operations science and digital technology to construction

Themes

Construction project delays and cost overrunsOperations science and production systemsDesign and construction integrationSupply coordinationDigital technology in construction

Based on publisher information and book metadata.

Book overview

The construction industry is as big as it is important. Without construction, our society would cease to be. We would have no ports, roads, or bridges. No communications networks, power grids, or water systems. No hospitals. No schools. No homes.

But we can barely get anything built. Capital projects are routinely finished late and over budget. Everyone acknowledges the problem, but no one seems to have the vision, or the will, to fix it.

The problem is the separation of "planning" from "doing" that has taken place over the last century. A misplaced focus on administration has marginalized the tasks of designing and building, which are the essence of construction.

New techniques and cutting-edge technology provide us with a different way of doing things. This is not mere theory; as author Todd Zabelle demonstrates, his company and other innovative firms are doing it now. But because too many construction professionals are set in their ways or are profiting from an ineffective system, nothing changes.

By drawing on operations science and focusing on the critical aspects of construction and on how we design, make, and build instead of administration, we can fix what has dogged the industry for decades while expanding the bottom line of owners, investors, and construction managers.

As Built to Fail argues,

- we must recognize projects as an assemblage of multiple production systems and use operations science to understand and influence their behavior and thus improve project outcomes.
- the Taylorist preoccupation with squeezing as much work out of workers as possible is counterproductive. Having "materials waiting on workers" is avoided at all costs over "workers waiting on materials," but we don't need to choose between these two options. When it comes to supply, we can replace "just in case" (stacking up inventory) with "just in time" (delivering supplies when and where they are needed).
- the separation of design from construction and the fallacy that design is a phase that can be "finished" has contributed to the problem. Design is an ongoing process through the life of the project.
- deployment is changing from a centralized model to a decentralized one: instead of a project situated in one location, headed by one design firm and a single lead contractor and regulated by one permit, we must contend with multiple locations and jurisdictions, governed by numerous permits, various suppliers, and a multiplicity of design firms.
- the future is autonomous and digital. Yet few construction firms really know how to utilize this technology. Built to Fail explains how AI and machine learning along with IoT, can be fused with operations science and data science to jump ahead of the pack.
Shipping & returnsShipping options, delivery timing, and our return policy.

In-stock items normally dispatch within 1–2 business days. The ZIP-code estimator on this page is informational only; the final shipping method, price, and availability are confirmed at checkout for your full order.

For the initial delivery estimate we use these transit windows after dispatch: Standard 5–8 business days, Expedited 2–4 business days, and Priority 1–2 business days. Holiday delays are not included.

Eligible items can be returned within 30 days in accordance with our return policy.

Customer reviews

M
AlbakiReads
Malaika Taylor

I highly recommend to for anyone looking for inner clarity

T
AlbakiReads
Thomas DiMassa

Great service and fast service

Great shopping experience! The book arrived quickly, was well packaged, and matched the description perfectly. I would definitely shop with you again

O
AlbakiReads
Olivia

Smooth.